PED4600-01-C

NavPod PED4600-01 PedestalPod Pre-Cut f/Garmin echoMAP™ 92sv, 93sv, 94sv & 95sv - Carbon Black

NavPod PED4600-01 PedestalPod Pre-Cut f/Garmin echoMAP™ 92sv, 93sv, 94sv & 95sv - Carbon Black
Free Shipping on this product
List Price
$399.99
Your Price
$374.99
Usually ships in 1-2 weeks

Shipping Information
Return Policy
Why Buy From Fondriest?

Details

PED4600-01 PedestalPod Pre-Cut for Garmin echoMAP 92sv, 93sv, 94sv & 95sv - Carbon Black

PedestalPods are better than bracket mounting. Very sturdy and secure, yet clean and attractive, this mount provides protection of your fishfinder/chartplotter from the harshest of wet boating conditions. PedestalPods provide the convenience of easily reaching and controlling the fishfinder/chartplotter while providing added security with protection from theft.

PedestalPods position your fishfinder/chartplotter at 20" off the deck and located near the bow and at the 45° angle for ease of viewing while fishing. This allows the user to easily reach and access the fishfinder/chartplotter for changes to range, zoom or even control the trolling motor.

PedestalPods are manufactured with a double gasket system that provides an excellent watertight seal keeping spray off the electrical connections on the back of your fishfinder/chartplotter assuring reliability and longevity of your marine electronics. 

Your fishfinder/chartplotter is easily flush mounted into the pre-cut face of the NavPod. The heavy duty, powder coated aluminum pedestal tube is 3” in diameter with a 5” round base and has a large 1.75” opening providing plenty of room for running wires and connectors internally for a very clean look and provides protection for wires and electrical connectors from water intrusion, UV exposure or damage from just getting kicked or snagged and ripped out of their sockets.

NavPods come with a security wrench and nickel chrome-plated stainless steel tamperproof screws for protection from theft.

There are pre-cut models available for 7" , 9" and 12" LCD displays from all major marine electronic manufacturers.

Image Part # Product Description Price Stock Order
NavPod PED4600-01 PedestalPod Pre-Cut f/Garmin echoMAP™ 92sv, 93sv, 94sv & 95sv - Carbon Black PED4600-01-C NAVPOD PEDESTALPOD PRE-CUT FOR GARMIN ECHOMAP 92SV/93SV/94SV
$374.99
Usually ships in 1-2 weeks

In The News

The Arizona Department of Environmental Quality's Water Quality Division

With an average rainfall of only 12.5 inches per year and a population that's growing faster than the country's , Arizona is a state that faces unique challenges, especially when it comes to clean, safe water. The Water Quality Division of the Arizona Department of Environmental Quality (ADEQ) protects and enhances public health and the environment by monitoring and regulating drinking water. And although they make use of the latest scientific methods and new technology, given the current state of Arizona's water system, they also rely upon low-tech equipment and cooperation from members of the community to monitor water quality in the state. Team members in the Groundwater Protection Program work to sample, test and characterize groundwater quality in all 51 of Arizona’s basins.

Read More

Latest Satellite and Eddy Covariance Data Shows Vulnerability of Trees to Drought

William Anderegg, assistant professor of biology at the University of Utah, has spent years studying drought-stricken trees all over the world. As climate change is expected to cause increased drought severity in the future, the work of Anderegg and his colleagues becomes increasingly important. In a previous interview for the Environmental Monitor , Anderegg found that a tree’s hydraulic safety margin was the best indicator of whether a tree would survive drought. The hydraulic safety margin is an expression of how the tree reacts under drought conditions, where there is very little water being pulled up the tree’s transport system and air is being pulled up instead. “It’s like a heart attack for the tree,” he noted.

Read More

A Balancing Act In The Grand Canyon: The High Flow Experiments

You've probably heard of the Four Corners region of the United States; that's where the corners of Arizona, New Mexico, Utah and Colorado meet at one point. These same four states are also part of the Colorado River Storage Project (CRSP), which began to change the face of the American West in 1956, enabling the population explosions in places like Phoenix and Los Angeles to continue thanks to usable water. Glen Canyon Dam is 220 meters high and 480 meters wide, and this massive structure has changed this section of the Colorado River all the way to Lake Mead dramatically. It has also increased low-flow magnitudes, decreased peak flow magnitudes and volumes and caused fluctuations in daily discharge levels that the area relies upon for generation of hydroelectric power.

Read More