400377

YSI TruLine Bromide Electrode

YSI TruLine Bromide Electrode

Description

TruLine combination bromide electrode, BNC connector, 1m cable

Features

  • Solid state ISE
  • Double junction reference
  • 0.4-79,900 mg/L range
Free Shipping on this product
List Price
$765.00
Your Price
$726.75
Usually ships in 3-5 days

Shipping Information
Return Policy
Why Buy From Fondriest?

Details

The TruLine series of laboratory ISEs consists of 15 electrodes that have an integrated reference, eliminating the need to have a separate reference half-cell. Each TruLine ISE has a refillable double-junction reference, resulting in a long electrode life and exceptional measurement reliability. TruLine ISEs can be connected to any ISE instrument featuring BNC connection, including the YSI 1320. Reference/electrode fill solution, ionic strength adjustor, and small bottle of standard are included with each ISE.

  • Wide selection of 15 electrodes for 16 different parameters
  • 4 sensor technologies - gas sensing, polymer/PVC membrane, solid state, and glass sensor
  • Combination (i.e. full-cell), refillable electrodes with double-junction reference
  • BNC connection, 1m cable
  • Made in the U.S.A
  • Reference/electrode fill solution, ionic strength adjustor, and small bottle of standard included with each ISE
  • 12 month warranty for solid state, glass sensor, and gas-sensing ISEs
  • 9 month warranty for ISEs with polymer/PVC membrane
What's Included:
  • (1) Electrode with 1m cable
  • (1) Small bottle of reference/electrode fill solution
  • (1) Small bottle of ionic strength adjuster
  • (1) Small bottle of standard solution
Image Part # Product Description Price Stock Order
YSI TruLine Bromide Electrode 400377 TruLine combination bromide electrode, BNC connector, 1m cable
$726.75
Usually ships in 3-5 days
Image Part # Product Description Price Stock Order
YSI TruLine Bromide Electrode Fill Solution 400378 TruLine bromide electrode fill solution, 60mL
$19.00
Usually ships in 3-5 days
YSI TruLine Bromide ISA 400379 TruLine bromide ISA, 500mL
$61.75
Usually ships in 3-5 days
YSI TruLine Bromide Standard 400380 TruLine bromide standard, 100 mg/L, 500mL
$61.75
Usually ships in 3-5 days
YSI TruLine Bromide Standard 400381 TruLine bromide standard, 1000 mg/L, 500mL
$61.75
Usually ships in 3-5 days
Additional Product Information:

Related Products

In The News

Successful ORSANCO Organic Detection System Expands Into Elk River, Charleston

Since 1978, water quality experts have been applying technological advancements to rivers and tributaries in the Ohio River Valley in an effort to stave off the worst possible water emergencies—with a large measure of success. In the latest expansion of the Ohio River Valley Water Sanitation Commission (ORSANCO) Organic Detection System (ODS), a new water quality monitoring station in the Elk River will help American Water Company officials in Charleston, West Virginia to more readily identify contaminants in the river and prevent public health disasters. Defining the need The ORSANCO ODS system has been protecting water quality by detecting pollution at its source in real-time for decades.

Read More

How Mussels Cope with Ocean Acidification Sheds Light on Effects of Climate Change

New research reveals that accelerating ocean acidification may be forcing the California mussel to adapt, transforming its fundamental shell structure. Although the mineralogical makeup of this mussel's shell has remained stable for millennia, comprised of neatly ordered, geometrically regular vertical rows of long, cylindrical crystals of calcite, recent samples exhibit structural changes that appear to be the result of escalating ocean acidification. New structures in record time Study leader and Florida State University Assistant Professor of Biological Science Sophie McCoy began the research after making a strange observation. “Mussels are a widely studied component of coastal marine communities, so they have always been an organism of interest,” comments Dr.

Read More

Weeks Bay NERR offers glimpse into ancient estuaries along the northern Gulf of Mexico

Mike Shelton, natural resources planner for Weeks Bay National Estuarine Research Reserve (NERR), has spent 17 years at the Reserve. The Reserve was founded in 1986 and is located in the Alabama and Florida coastal region. “It’s a great place for outdoor enthusiasts. Places like this are why we live on the coast,” he enthuses. “There’s also a lot of history here. It’s one of the first areas settled by the Europeans after they arrived in America. The city of Pensacola was the second city built in the U.S.,” adds Scott Phipps, research coordinator for Weeks Bay NERR. Weeks Bay NERR monitoring follows the same System Wide Monitoring Program (SWMP) as the other 28 NERRs, which includes deploying data-gathering sondes throughout the Bay.

Read More