Proactive Mini-Monsoon 12V Plastic Pump

The Proactive Engineered Plastic Mini-Monsoon pump is capable of pumping up to 70 feet from ground level by simply connecting it to a 12V battery.

Features

  • Sleek outside design minimizes well hang-ups
  • Pump can run continuously in water without the need for a cool down
  • 400 hour motor life provides a very economical sampling and purging solution
List Price $246.98
Your Price $225.12
Stock 2AVAILABLE

Overview
The Proactive Engineered Plastic Mini-Monsoon pump is capable of pumping up to 70 feet from ground level by simply connecting it to a 12-volt battery. Its reliable design is suitable for continuous sampling and purging of groundwater wells.

Note: All pumps from Proactive are manufactured from PFOA-Free Parts (Except Abyss Pump Line).

  • Power Consumption: 195 Watts (max)
  • Volt Recommendation: 12-15V at source
  • Maximum Amp Output: 13 Amps
  • Measurements: 20" length x 1.82" diameter
  • Use With: Optional Low Flow Sampling Controller
  • Required Tubing: 3/8" or 1/2" ID tubing
  • (1) 12V Engineered Plastic Mini-Monsoon pump with 80' wire lead
  • (1) Set of 12V battery clamps
Questions & Answers
No Questions
Did you find what you were looking for?

Select Options

  Products 0 Item Selected
Image
Part #
Description
Price
Stock
Quantity
Proactive Mini-Monsoon 12V Plastic Pump
P-10300
Mini-Monsoon 12V plastic pump with 80' wire lead & battery clamps
Your Price $225.12
2 Available
  Accessories 0 Item Selected
Notice: At least 1 product is not available to purchase online
×
Multiple Products

have been added to your cart

There are items in your cart.

Cart Subtotal: $xxx.xx

Go to Checkout

In The News

SUNY ESF/Syracuse U. study finds in-stream restoration structures effective

Planning stream restorations is becoming more important as the number of projects increases nationwide, in efforts to enhance water quality and habitat health of surrounding areas. Researchers at the State University of New York College of Environmental Science and Forestry (SUNY ESF) and Syracuse University led a study of two streams in upstate New York that had undergone restoration. They found restoration work created large areas of "transient storage" where water is temporarily retained behind restoration structures that enhanced downwelling to rates not observed in reference reaches. In natural streams, these transient storage zones are known to host biological and chemical processes that allow the stream to clean itself.

Read More

Puget Sound sediment study looks to fill degraded inlet's data gap

Sediment in Washington State’s Puget Sound is growing more polluted, and scientists aren’t entirely sure why. Water quality specialists from the U.S. Geological Survey aim to change that. The Washington State Department of Ecology recently reported that some aspects sediment health in the sound have gotten worse over the last decade. Poor sediment quality has adversely impacted macroinvertebrates and water quality. A new USGS study is tracing Puget Sound sediment upstream to its tributary rivers to evaluate sediment volumes and quality.

Read More

Choptank River watershed nitrate monitoring targets conservation efforts

­A nutrient monitoring effort throughout a degraded Chesapeake Bay watershed is helping chart the path of nitrate through the system. The monitoring is part of a plan to target federally funded agricultural conservation practices to the places in the watershed that need them most. The Choptank River is among one of the largest tributaries to the Chesapeake Bay, a system plagued by excess nutrients. The Choptank flows across the Delmarva Peninsula, a 170-mile-long piece of land that makes up the bay's eastern shore. More than half of the Choptank's watershed is covered in agricultural land, which is part of the reason the river has been listed as impaired under Clean Water Act standards for nutrients and sediment.

Read More